Road Marking and Sign Installation in TRNC Until January 10
Until January 10, 2025, road marking and sign installation will take place on various roads in the Turkish Republic of Northern Cyprus (TRNC).
According to an announcement from the Department, the work will be carried out on the following roads:
- On the Erjan – Geçitkale Intersection – İskele road, from December 26 to 29.
- On the Erjan – Gaziköy – Paşaköy – Vadili – Akdoğan – Dörtyol road, from December 30, 2024, to January 10, 2025.
- On the Paşaköy – Dilekkaya – Erdemli – Yiğitler road, from December 30 to January 10.
Drivers are urged to pay close attention to temporary signs during this period.

© cyprus-faq.com: when copying this material in full or in part, a link to the source is required.
You may also be interested in:
- Damage from non-functioning radars in the TRNC exceeded 600 million lira
- 85.6% of Northern Cyprus residents believe the country is heading in the wrong direction — STUDY
- Neurosurgeon Çağın Ozankaya represented the TRNC at a deep brain stimulation congress in Vienna
- TRNC Foreign Ministry Rejects Rotating Presidency Model for Cyprus
- TRNC Prime Minister Üstel promises to present family support projects within 80 days


Comments (0)