30 more houses to be connected to sewage system in Gönyeli
Work on expanding the sewage network continues in the Gönyeli area.
According to the Mayor of Gönyeli–Alayköy, Hüseyin Amcaoğlu, a new 548-meter section of the system is being laid on Kerpiçevler Street, which will connect 30 more houses to the sewage network.
The work is proceeding according to plan and is expected to be completed by next week. Simultaneously, rainwater drainage lines are also being installed in the area.
Upon completion of the infrastructure works, road paving is planned.
© cyprus-faq.com: when copying this material in full or in part, a link to the source is required.
You may also be interested in:
- Damage from non-functioning radars in the TRNC exceeded 600 million lira
- 85.6% of Northern Cyprus residents believe the country is heading in the wrong direction — STUDY
- Neurosurgeon Çağın Ozankaya represented the TRNC at a deep brain stimulation congress in Vienna
- TRNC Foreign Ministry Rejects Rotating Presidency Model for Cyprus
- TRNC Prime Minister Üstel promises to present family support projects within 80 days


Comments (0)