Roadworks on Kerpiçevler Street in Gönyeli Completed
The laying of new asphalt has been fully completed in the Kerpiçevler Street area. The work at the site was carried out by the Gönyeli-Alayköy Municipality.
The road surface was renewed immediately after a major reconstruction of the underground infrastructure. New sewer lines and a drainage system for rainwater runoff had previously been installed in this section.
According to the local authorities, the infrastructure upgrade in the area was carried out comprehensively. The site has now been fully put into operation and opened to traffic.
© cyprus-faq.com: when copying this material in full or in part, a link to the source is required.
You may also be interested in:
- Damage from non-functioning radars in the TRNC exceeded 600 million lira
- 85.6% of Northern Cyprus residents believe the country is heading in the wrong direction — STUDY
- Neurosurgeon Çağın Ozankaya represented the TRNC at a deep brain stimulation congress in Vienna
- TRNC Foreign Ministry Rejects Rotating Presidency Model for Cyprus
- TRNC Prime Minister Üstel promises to present family support projects within 80 days


Comments (0)