In Limassol, 100 kilometers of water pipeline will be fully replaced for €9.2 million
The Limassol Water Board (WBL) has announced the launch of a major infrastructure project to upgrade the city’s water distribution network. As part of the program, about 100 kilometers of outdated and worn water pipes will be fully replaced. The total cost of the large-scale works is estimated at 9.2 million euros.
The main goal of the modernization is to dramatically reduce commercial and technical water losses caused by hidden leaks in the old system, which is especially critical for the island amid the current shortage of water resources.
© cyprus-faq.com: when copying this material in full or in part, a link to the source is required.
You may also be interested in:
- 16-year-old killed on racing motorcycle in Paphos area
- About ten people attacked a courier in Germasogeia, four arrested
- A new wave of high-rises is beginning in Limassol, with the 181-metre AURA set to be the tallest
- The decline in tourism in Cyprus will reach around 5% by the end of the year
- DIKO leader calls for Cyprus finance minister’s resignation over Great Sea Interconnector project


Comments (0)